Expertise & evidence

Specialist judgment developed across engineering, operations and technology.

The company is built on more than two decades of international upstream experience and published technical contribution.

Founder

Thiago Pinheiro da Silva

Mechanical Engineer and MSc in Petroleum Engineering, with 23+ years of upstream experience spanning complex drilling, pressure management, real-time operations, engineering modelling and digital decision-support development.

Specialist territory

  • MPD, PMCD, UBD and CTD applications
  • Deepwater and technically constrained well delivery
  • Hydraulics, rheology and multiphase engineering
  • Real-time engineering and operational decision support
  • Engineering software and structured technical workflows
View LinkedIn profile
Publications

Published technical contribution

Author and co-author of selected SPE, IADC and OTC technical papers covering managed-pressure drilling, complex-well execution, pressure management and operational learning.

Evidence standard

Only publicly verifiable publication records will be used in public materials.

Capability

Representative work

Anonymized experience includes operating-strategy development, engineering-model verification, technical procedure assurance, real-time event interpretation, equipment/system review and decision-support workflow design.

Confidentiality standard

No client, well, vendor or proprietary project information is disclosed without authorization.

Explore selected experience

Project lifecycle

From opportunity screening to execution readiness.

Pressure-drilling technical lead and project manager across FEL0 to FEL3. The stage terminology varies between operators; the work below is what it has meant in practice.

FEL0
Opportunity identification and technology screening

Assessing whether MPD, PMCD, UBD or CTD can technically and economically address the anticipated drilling challenge. Early feasibility evaluations across the Middle East, South America and Asia, and initial screening for ultra-extended-reach development wells.

FEL1
Concept development and feasibility

Defining the drilling problem, evaluating alternative pressure-management concepts, establishing initial design premises, and identifying the equipment, modelling, risk-review and implementation requirements that follow from them.

FEL2
Concept selection and front-end engineering

Developing the selected concept through hydraulic and multiphase modelling, operating-envelope definition, equipment and rig-interface requirements, drilling and tripping strategies, risk reviews and implementation planning.

FEL3
Detailed engineering and execution readiness

Producing or reviewing detailed engineering, procedures, IMEs and operations matrices, MGS and RGH assessments, equipment integration, well-control interfaces, HAZID/HAZOP actions, regulatory documentation, training, commissioning and operational-readiness requirements.

Several assignments extended across more than one stage — from initial feasibility and concept selection through detailed engineering, rig readiness, field implementation and post-well review.

Scope of contribution

Stated precisely, including where it ends.

Field development planning

Specialist well-engineering input supporting field-development planning: expected pressure-management and wellbore-stability challenges, preliminary drilling and tripping strategy, hydraulic-modelling and operating-envelope requirements, and the rig modifications, equipment, risk reviews, training and readiness activities implied by them.

Where it ends

The specialist drilling-engineering contribution — not ownership of the reservoir, facilities, commercial or overall FDP approval process.

AFEs, well costs, schedules and budgets

Preparing the technical, cost and schedule inputs that support AFEs and well-cost estimates: technical and economic feasibility, engineering and equipment definition, personnel, training, mobilisation and rig-integration requirements, tender and vendor-scope review, technical bid evaluation, equipment manifests, rig-up sequences and critical-path implications — and the cost and schedule consequences of alternative concepts.

Where it ends

The pressure-drilling scope and technical basis used in the AFE — not ownership of the complete well AFE, nor final approval authority for the operator’s drilling budget.

Engineering decisions should be supported by reliable data, validated models, operational observations and transparent reasoning.
Essentials principle · Evidence before assumption

Need independent expertise?

Bring the right technical depth to the question that matters.