6–8 daysMPD hydraulic model assurance
Does the model deserve the authority the operating plan gives it?
What is reviewed
- Basis of design, and the assumptions the model actually rests on
- Input data quality, units, and reference depths
- Operating-envelope derivation and its margins
- Model behaviour against measured well response, where data exists
- Limits of validity — where the model should not be relied on
Deliverable
A written opinion stating what was checked, what was not, what the conclusion rests on, and what would change it. Findings ranked by materiality rather than by count.
10–14 daysPre-spud readiness review
Are the well, the equipment, the model and the procedures one coherent system?
What is reviewed
- Basis of design and model limits as a single system, not as separate documents
- Equipment interfaces and rig integration
- Fingerprinting plan, connection and tripping sequences
- Well-control interface and contingency logic
- Procedures and operational-readiness requirements against all of the above
Deliverable
Prioritised findings with a clear readiness basis, in time to act on them. Each finding states the consequence of not addressing it, so the operator can decide what matters.
8–12 daysPost-well and campaign diagnostic
What actually happened, and what should the next well do differently?
What is reviewed
- Measured pressure response against what was predicted
- Connection, loss and influx events, separated from model artefacts
- Where the operating strategy held, and where it did not
- Data and instrumentation quality, including what could not be concluded
- Recommendations carried into the next well as specific changes
Deliverable
A diagnostic that separates observation from interpretation from recommendation, so a reader can disagree with the conclusion without losing the evidence.
4–6 daysMud gas separator capacity assessment
Which limit governs the separator, and how much margin is left?
What is reviewed
- Operating pressure: vent losses, elevation and liquid seal together
- Gas venting through the as-built vent line and fittings
- Gas-liquid separation, and the limits of the sizing method
- Liquid handling: carry-under, outlet velocity, liquid level
- Sensitivity to mud weight, gas gravity, rates and restrictions
Deliverable
The governing limit and its margin for every case, plus an operating-limit summary for procedures, influx management envelopes and MPD operating matrices. An engineering analysis — not certification or inspection.